After a new transformer had already optimized the power supply at the site in October 2020, a new low-voltage distribution system also had to be put into operation for the installation of the new equipment. This is equipped with a new reactive power compensation system to optimize energy efficiency and records electricity consumption precisely via a modern energy data measuring system.